Energy needed for production.
AAC block:- low energy required
CLC block:- Normal energy required
MEP work.
AAC block:- can be easily cut, nailed and drilled
CLC block:- difficult to cut and work with it
Raw Material.
AAC block:- fly ash, aeration compound and cement
CLC block:- cement, sand and aggregate
Cost.
AAC block:- minimum 40 INR per price. And maximum 80 INR per peice.
CLC block:- 1800-2100 per m3