Skip to main content
Jordan Holt
Safety Manager
Asked a question last year

how to write the method statement of concrete ground water tank structural design

Structural Drawing is included

Where am I?

In TheConstructor you can ask and answer questions and share your experience with others!

Seth Morgan
Construction Superintendent

Sir, I will share some information related with different drawings:

Architectural Drawing can be termed as the mother drawing for all the other drawing. Structural drawing is the backbone drawing of the building. Electrical drawing represent the details of electric fixtures, location of switches. Plumbing drawing give the location of sanitary, piping for water supply system.